The Moterway NHA Awards Khuzdar–Kuchlak Section Dualization Project for Rs. 8.8 Billion
The Moterway NHA Awards Khuzdar–Kuchlak Section Dualization Project for Rs. 8.8 Billion The National Highway Authority (NHA) Executive Board has approved the award of works for the Dualization of the Khuzdar–Kuchlak section of National Highway (N-25) to the lowest evaluated bidder M/s SMADB-SHAHRUKH-MBC Joint Venture, at a bid price of Rs. 8.786 billion. Official documents revealed that the meeting of the National Highway Authority’s Executive Board, chaired by Chairman NHA, Capt. (Retd.) Muhammad Khurram Agha, considered the award of works for the Dualization of the Khuzdar–Kuchlak Section of National Highway (N-25). The Board approved the award to the lowest evaluated bidder M/s SMADB-SHAHRUKH-MBC Joint Venture, at their evaluated/corrected bid price of Rs. 8.786 billion, which according to the Authority is 22.33 percent below the engineer’s estimate of Rs. 11.312 billion. The NHA Executive Board approved Addendum No. 1 of Rs. 10.889 million to the Consultancy Contract titled, ...